Installation Process
System Design & Installation Process
EcoSystem Infra Pvt. Ltd. provides a modular and high-load bearing rainwater harvesting solution designed for effective groundwater recharge.
01
Drilling Work
Initial drilling is carried out as per site survey and water table depth.
02
Excavation & Base Preparation
Excavation of pit and preparation of strong base foundation.
03
Laying of Geotextile
Geotextile fabric is laid to prevent soil particles from entering the system.
04
Module Installation
EcoSystem modular units (Load capacity 30–50 Ton) are installed.
05
Back Filling
Backfilling is done carefully to secure modules and maintain stability.
06
Filter Connection
High-capacity filtration units are connected for clean water flow.
07
Site Completed
Final inspection and site completion for efficient rainwater recharge.